![]() It utilises SIPs panel construction and has a render applied to the outside, except for where the thermal air collector is. The energy demand of the house is close to Passivhaus levels, and both thermal and electricity energy storage has been incorporated. Integration of Technologies and ArchitectureĪ systems approach has been used to integrate the technologies together, and to integrate those technologies into the architecture. ![]() That way they were able to keep control of the project and ensure they remained within budget. They managed the project themselves but employed a construction manager to oversee the site. The Wales European Funding Office provided some of the funds which needed to be spent fairly quickly, so that provided an incentive to get it done! ![]() It has Taken Just 18 Months to Design and Buildįrom previous projects that they've worked on, they knew the technologies that they wanted to optimise into the process.